K-RE100 support, built around your company

K-RE100 is hard to read and hard to price.
OpenEnergy runs it for you.

From a K-RE100 portfolio built for your company, to procurement we run on your behalf.
OpenEnergy, a KEPCO in-house venture, works alongside you.

Verified & Supported by

환경부
중기부 청년사관학교
창업진흥원
동서발전
한국전력
와이앤아처
PTT 그룹
환경부
중기부 청년사관학교
창업진흥원
동서발전
한국전력
와이앤아처
PTT 그룹

Why now

Now it's your turn

This used to be a large-company problem. Now, for large buyers to hit their own RE100 targets, they have to ask it of their suppliers — and that request shows up in the annual scorecard.

RE100 mandate

Source: Volvo — 2023, a Korean parts supplier case

Case 01 / 03

Volvo: "Make every part with renewable power" — a supplier that couldn't comply lost the contract

A Korean parts supplier that could not meet the requirement to produce with renewable energy only by 2025 lost a contract at the final stage.

K-RE100 isn't a cost — it's how you protect your revenue.

What we hear

The three biggest blockers companies hit with K-RE100

The concerns we heard most often interviewing 80 Korean suppliers over the last six months.

Manufacturing · production lineManufacturing · production line

Procurement team, Mr. Kim

We've been told to do RE100, and we don't even know where to start

We received the buyer's requirement, but we don't know where to begin given our size and situation. We don't have anyone dedicated to this.

Electronic componentsElectronic components

ESG lead, Ms. Lee

We have no way to tell if a quote is fair

Comparing PPA, REC and green premium quotes means contacting five to ten suppliers ourselves. We still have no basis to tell whether what we're quoted is expensive or cheap.

Semiconductor componentsSemiconductor components

Finance team, Mr. Park

One wrong contract and we're afraid of the penalty

RE100 contracts run ten years or more, at a large scale. We have seen cases where the cost of exiting a bad contract outran the margin on the underlying business.

Our answer

How OpenEnergy works

Complex K-RE100, handled on your side, start to finish

Made simple

The hard parts, made simple

We put both the terms and the process into plain language and numbers for your company. You don't need to know renewable energy procurement going in.

PPARECGreen tariffSelf-generationCBAMContract capacity

Complex terms and rules

For your company:

Start here, in this order

Fair price

Same PPA — is your company paying more?

The same PPA prices very differently by generation time block and contract terms. We read how the price is set on your behalf, and check whether it is fair before you sign.

Same PPA, compared

If you sign as offeredBefore check
After we check fair priceFair price

The same PPA prices differently by time block and terms. We check whether it's fair, on your behalf.

End to end

We run it, start to finish

From diagnosis to design, procurement and execution, we run the full process so your team does not have to chase it yourselves.

Diagnose

Design

Procure

Run it

You only decide — we run the rest.

How it works

Not a one-time fix — we stay with you every year

energybridge· DiagnoseU

Cost leaks found

₩5.6M / yr

Power-factor loss · if PF improves 0.89 → 0.95

Contract capacity checkChecked
30% floor ruleNot applicable
Peak load shiftRoom to improve

Monthly usage · kWh

August peak — shift load to save

Diagnose · FreeYour bill, turned into cost and savings numbers

Learn first

K-RE100 feels hard right now — start by understanding it

Not ready for a diagnosis or full-service procurement yet? Start by reading. Free resources written from a supplier's point of view, without the jargon.

Why us

Why OpenEnergy?

01

We run it end to end

From diagnosis to design, procurement and execution — the full process, so your team doesn't have to chase it themselves. You don't need an in-house specialist.

KEPCO

We read the pricing

The same PPA prices very differently by generation time block. Because we came from KEPCO, we know how the price is actually set — and we check whether it is fair before you sign.

03

We prove it with numbers

We apply KEPCO's actual tariff rules — contract capacity, power factor, the 30% floor — to work out your cost in verified numbers, not guesswork.

Start now

K-RE100 is complex.
Start with one electricity bill.

See your company's K-RE100 transition cost in about three minutes, free.