Resource Library
Renewable energy and ESG resources for Korean suppliers
Official guides on buyer ESG and CBAM compliance, K-RE100 procurement, and KEPCO electricity costs — curated for companies that supply Korean manufacturers.
🏭 Buyer ESG & CBAM compliance
17 resources · 6 explainersFor responding to a buyer’s ESG or CBAM requirement
Scope 3 Emissions Calculation Guide for the Semiconductor Industry
This document is written squarely for our target audience. It includes a semiconductor value chain map, a list of upstream raw materials and equipment, and materiality priorities — giving you a direct sense of what to prepare for a client's Scope 3 data request.
Source 2025.03
How Apple Brought 320 Suppliers to Renewable Power
We analysed Apple's official Supplier Clean Energy Program documents (EPR 2024, CoC v5) from the perspective of Korean semiconductor and electronics suppliers — for when a client has raised an RE100 requirement and you're unsure how far Apple's supplier standards actually go.
2026.06 · PDF · 542KB
EU CBAM: Implementing Regulations and the Strengthening Amendments
Our library's earlier CBAM material was still based on the transitional-period rules. This document compiles the implementing regulations issued once full enforcement from 2026 was confirmed, filling that gap. It's an article-by-article commentary, so it isn't an easy read, but the final chapter, "What Companies Need to Know," can be read on its own first.
Source 2026.01
"We Make Semiconductors, So CBAM Isn't Our Problem" — Check Your Export Declaration First
CBAM applies by product (CN code), not by industry. Semiconductor devices and equipment aren't covered, but processed steel and aluminum products such as screws, bolts, and metal structures already are. This piece covers, based on the guidance for non-EU operators published by the European Commission, the steps for determining coverage using your export declaration certificate.
2026.08
What SK hynix Asks of Its Suppliers on Carbon and RE100
We analysed SK hynix's 2024 Sustainability Report from the perspective of tier-1 and tier-2 suppliers.
2026.06 · PDF · 346KB
Casebook: Organizational Boundaries and Scope 1-2 Emissions Calculation
When a client asks for emissions data, many companies get stuck on "where does our organizational boundary end." This government casebook uses examples to show how companies without direct measurement data can still make estimates. It covers cases that are genuinely confusing in practice, like commuter buses and franchise outlets.
Source 2026.03
There Is a Ceiling on What a Buyer Can Ask: The Line the EU Omnibus Drew
The EU Omnibus revision put a cap on the ESG information a client company can demand from its suppliers. Suppliers with 1,000 or fewer employees cannot be required to provide information beyond the voluntary SME standard, and contract clauses that force this are unenforceable. This piece lays out the underlying provisions article by article.
2026.07
What Samsung Electronics Asks of Its Suppliers on Carbon and RE100
We analysed Samsung Electronics' official documents from the perspective of tier-1 and tier-2 suppliers.
2026.06 · PDF · 1.5MB
Apple Supplier Code of Conduct
It requires manufacturing suppliers to source 100% of Apple-related production electricity from renewable energy, and even specifies which types of renewable energy are recognized. It also requires annual reporting of emissions and targets, with third-party verification. Treat it as a baseline for gauging how demanding a client's requirements can get.
Source 2025.11
EU CBAM Goes Live: What It Means for the Semiconductor Supply Chain
Finished semiconductor products aren't yet directly covered by CBAM. But as CBAM enters full implementation in 2026 and its scope expands to downstream products, the semiconductor supply chain is coming within reach of carbon-data requirements too. This piece covers CBAM's phase-in schedule, the products currently covered, and what to prepare now.
2026.07
- Source⭐ FeaturedDocument in Korean
Scope 3 Emissions Calculation Guide for the Semiconductor Industry
Korea Environmental Industry & Technology Institute (KEITI) · Public institution · Source 2025.03
Korea Environmental Industry & Technology Institute (KEITI)
Public institution
Source
2025.03
- Insight
"We Make Semiconductors, So CBAM Isn't Our Problem" — Check Your Export Declaration First
Signals from abroad · 2026.08
Signals from abroad
2026.08
- Download⭐ FeaturedDocument in Korean
How Apple Brought 320 Suppliers to Renewable Power
Our own resource · 2026.06
Our own resource
2026.06
- Insight
There Is a Ceiling on What a Buyer Can Ask: The Line the EU Omnibus Drew
Signals from abroad · 2026.07
Signals from abroad
2026.07
- SourceDocument in Korean
EU CBAM: Implementing Regulations and the Strengthening Amendments
KOTRA Brussels Korea Business Center · Public institution · Source 2026.01
KOTRA Brussels Korea Business Center
Public institution
Source
2026.01
- Insight
EU CBAM Goes Live: What It Means for the Semiconductor Supply Chain
Signals from abroad · 2026.07
Signals from abroad
2026.07
- SourceDocument in Korean
Casebook: Organizational Boundaries and Scope 1-2 Emissions Calculation
Ministry of Climate, Energy and Environment · Korea Environmental Industry & Technology Institute (KEITI) · Government ministry · Source 2026.03
Ministry of Climate, Energy and Environment · Korea Environmental Industry & Technology Institute (KEITI)
Government ministry
Source
2026.03
- Insight
RE100 Criteria Changed Again: Three Things Korean Suppliers Should Check Now
Signals from abroad · 2026.07
Signals from abroad
2026.07
- SourceDocument in Korean
Apple Supplier Code of Conduct
Apple · Company · Source 2025.11
Apple
Company
Source
2025.11
- Insight
How Other Countries Are Answering CBAM, and What It Means for Korea
Signals from abroad · 2026.06
Signals from abroad
2026.06
- SourceDocument in Korean
TSMC: Carbon Reduction as a Supplier Selection Criterion
TSMC · Company · Source 2024.12
TSMC
Company
Source
2024.12
- Insight
EU CBAM Starts Charging Soon: A Readiness Check for Korean Exporters
Signals from abroad · 2026.06
Signals from abroad
2026.06
- SourceDocument in Korean
GHG Protocol Scope 2 Guidance
GHG Protocol (WRI·WBCSD) · Industry association · Source 2015.01
GHG Protocol (WRI·WBCSD)
Industry association
Source
2015.01
- SourceDocument in Korean
Samsung Electronics Supplier Code of Conduct
Samsung Electronics · Company · Source 2026.06
Samsung Electronics
Company
Source
2026.06
- SourceDocument in Korean
EU CBAM Transitional Period: What It Covers and What It Means
Korea International Trade Association (KITA), Institute for International Trade · Industry association · Source 2023.09
Korea International Trade Association (KITA), Institute for International Trade
Industry association
Source
2023.09
- SourceDocument in Korean
Guidebook: Responding to EU ESG Trade Policy
KOTRA · Public institution · Source 2024.11
KOTRA
Public institution
Source
2024.11
- SourceDocument in Korean
Guidebook to the EU CSDDD for Korean Exporters
Korea Chamber of Commerce and Industry (KCCI) · Industry association · Source 2024.10
Korea Chamber of Commerce and Industry (KCCI)
Industry association
Source
2024.10
- SourceDocument in Korean
Plain-Language Guide to CBAM Emissions Calculation — General Volume
Joint publication by the relevant ministries · Government ministry · Source 2024.06
Joint publication by the relevant ministries
Government ministry
Source
2024.06
- SourceDocument in Korean
CBAM Response Manual for SMEs and Mid-Sized Firms v1.0
Global Compact Network Korea (GCNC) · Industry association · Source 2025.05
Global Compact Network Korea (GCNC)
Industry association
Source
2025.05
- SourceDocument in Korean
K-ESG Guidelines for Supply Chain Due Diligence
Ministry of Trade, Industry and Energy · Government ministry · Source 2022.12
Ministry of Trade, Industry and Energy
Government ministry
Source
2022.12
- DownloadDocument in Korean
What SK hynix Asks of Its Suppliers on Carbon and RE100
Our own resource · 2026.06
Our own resource
2026.06
- DownloadDocument in Korean
What Samsung Electronics Asks of Its Suppliers on Carbon and RE100
Our own resource · 2026.06
Our own resource
2026.06
- DownloadDocument in Korean
When a Buyer Asks You for Carbon and Renewable Energy Data
Our own resource · 2026.06
Our own resource
2026.06
☀️ Getting started with K-RE100
17 resources · 8 explainersFor starting to procure renewable energy
RE100 Handbook for Korean Companies
Starts from what RE100 actually is. Each of the five implementation options is explained in order — concept, purchase procedure, practical steps, support programs — making it a good first document for anyone newly handed such a request from a client. Note that it is current as of July 2024 and does not reflect later policy changes.
Source 2024.07
Company Registration Manual for the Renewable Energy Use Certificate
The only document that walks through the process click by click, from signing up for the management system, to submitting performance data, to issuing the usage certificate — a supplier staffer can follow it exactly as written.
2026.07
Rooftop Solar on a Korean Factory: The Permits, in Order
Self-consumption solar doesn't require a power generation business license. Permitting for rooftop solar on a factory proceeds in this order: construction plan filing, pre-use inspection, KEPCO grid interconnection, and development permit. Based on the original statutory text, this piece covers the procedures required at each capacity tier, surplus power rules, and cost items that are easy to overlook.
2026.09
Guide to Renewable Energy Matching Products in Korea
This is for after you've chosen an option — it covers where to actually apply. It uses cases to show what form the matching between suppliers and buyers actually takes as a product. It does not explain what RE100 is, so it's best read after the "RE100 Handbook."
Source 2025.01
Rooftop Solar or Direct PPA: Which Pays Back Faster for a Korean Plant?
Factory rooftop self-generation and a direct PPA are both recognized as 100% RE100 solutions, and the choice comes down to three factors: site, capital, and how long the business will run. Using a 5,000MWh supplier example, this piece compares 20-year ROI, when combining self-generation with a PPA works best, and includes a 5-minute self-check.
2026.06
Corporate Renewable Energy Procurement Guidelines
This is nearly the only Korean-language document that compares all four options — green premium, REC, PPA, and self-generation — in one place. We recommend reading it first, before the individual regulations, to get the overall lay of the land. Note that it dates from 2024, before the December 2025 PPA notice revision, so check the notice itself for detailed requirements.
Source 2024.01
K-RE100's Five Compliance Routes Compared: Which Mix Fits Your Plant
K-RE100 has five implementation options: green premium, REC purchase, third-party PPA, equity investment, and self-generation. This piece compares each option by cost, timeline, risk, and level of global recognition, and covers recommended combinations by company size and situation. RE100 isn't about picking one option — it's about designing a portfolio.
2026.06
Rules on REC Issuance and Market Operation
This is the authoritative rulebook for REC issuance and market operation. The RE100 certificate trading market also follows these rules. It's the May 2026 revision, so when reviewing a REC purchase, checking conditions against this document is the accurate approach.
Source 2026.05
Standard Contract for Direct Power Trading
A public template you can use as a reference when drafting a direct PPA contract for the first time. It's also useful for checking whether clauses are missing from a contract proposed by a power provider. It's the 2023 edition, and whether it reflects the December 2025 notice revision has not been confirmed.
Source 2023.06
Public Notice on Direct Power Trading of Renewable Electricity
This is the legal basis for direct PPAs. Participation requirements and trading methods are set out here, so you can check whether the contract terms proposed by a power provider match the notice. Following the December 2025 revision, jurisdiction moved to the Ministry of Climate, Energy and Environment.
Source 2025.12
- Source⭐ FeaturedDocument in Korean
RE100 Handbook for Korean Companies
Korea Energy Agency · Korea Chamber of Commerce and Industry (Corporate Renewable Energy Support Center) · Public institution · Source 2024.07
Korea Energy Agency · Korea Chamber of Commerce and Industry (Corporate Renewable Energy Support Center)
Public institution
Source
2024.07
- Insight
Rooftop Solar on a Korean Factory: The Permits, in Order
Procurement options · 2026.09
Procurement options
2026.09
- Source⭐ FeaturedDocument in Korean
Company Registration Manual for the Renewable Energy Use Certificate
Korea Energy Agency · Public institution · 2026.07
Korea Energy Agency
Public institution
2026.07
- Insight
Rooftop Solar or Direct PPA: Which Pays Back Faster for a Korean Plant?
Procurement options · 2026.06
Procurement options
2026.06
- SourceDocument in Korean
Guide to Renewable Energy Matching Products in Korea
Corporate Renewable Energy Support Center (commissioned by Korea Energy Agency, operated by KCCI) · Public institution · Source 2025.01
Corporate Renewable Energy Support Center (commissioned by Korea Energy Agency, operated by KCCI)
Public institution
Source
2025.01
- Insight
K-RE100's Five Compliance Routes Compared: Which Mix Fits Your Plant
Procurement options · 2026.06
Procurement options
2026.06
- SourceDocument in Korean
Corporate Renewable Energy Procurement Guidelines
Corporate Renewable Energy Initiative (CoREi) · Industry association · Source 2024.01
Corporate Renewable Energy Initiative (CoREi)
Industry association
Source
2024.01
- Insight
Scope 1, 2 and 3 in Five Minutes, Explained with a Pizza
Procurement options · 2026.06
Procurement options
2026.06
- SourceDocument in Korean
Rules on REC Issuance and Market Operation
Korea Energy Agency, New & Renewable Energy Center · Public institution · Source 2026.05
Korea Energy Agency, New & Renewable Energy Center
Public institution
Source
2026.05
- Insight
Work Out Your Factory's Scope 1-2 Emissions in Excel
Procurement options · 2026.06
Procurement options
2026.06
- SourceDocument in Korean
Standard Contract for Direct Power Trading
Korea Power Exchange (KPX) · Public institution · Source 2023.06
Korea Power Exchange (KPX)
Public institution
Source
2023.06
- Insight
Does RE100 Reach Your Company? An Eight-Question Self-Check
RE100 in Korea · 2026.06
RE100 in Korea
2026.06
- SourceDocument in Korean
Public Notice on Direct Power Trading of Renewable Electricity
Ministry of Climate, Energy and Environment · Government ministry · Source 2025.12
Ministry of Climate, Energy and Environment
Government ministry
Source
2025.12
- Insight
The Higher Korean Tariffs Go, the Better PPAs Look: The 2026 Reform and the RE100 Maths
Procurement options · 2026.06
Procurement options
2026.06
- SourceDocument in Korean
REC Trading Manual for Buyers
Korea Energy Agency · Public institution · Source 2023.02
Korea Energy Agency
Public institution
Source
2023.02
- Insight
RE100 for Korean Semiconductor Suppliers: Where to Start
RE100 in Korea · 2026.05
RE100 in Korea
2026.05
- SourceDocument in Korean
KEPCO Grid Use Rules: Technical Standards for Distributed Generation
Korea Electric Power Corporation (KEPCO) · Public institution · 2026.09
Korea Electric Power Corporation (KEPCO)
Public institution
2026.09
- SourceDocument in Korean
RE100 Status and Renewable Procurement Trends in Korea
Korea Energy Agency · Public institution · Source 2025.06
Korea Energy Agency
Public institution
Source
2025.06
- SourceDocument in Korean
Renewable Energy Use Confirmation Scheme: Participation Data
Korea Energy Agency · Public institution · Source 2025.06
Korea Energy Agency
Public institution
Source
2025.06
- SourceDocument in Korean
Guideline on Trading Renewable Electricity
Ministry of Climate, Energy and Environment · Government ministry · Source 2025.12
Ministry of Climate, Energy and Environment
Government ministry
Source
2025.12
- SourceDocument in Korean
Guideline on Third-Party PPAs for Renewable Electricity
Ministry of Climate, Energy and Environment · Government ministry · Source 2025.12
Ministry of Climate, Energy and Environment
Government ministry
Source
2025.12
- SourceDocument in Korean
RE100 Technical Criteria (Korean edition)
Climate Group (RE100) · Industry association · Source 2025.03
Climate Group (RE100)
Industry association
Source
2025.03
- SourceDocument in Korean
2025 Survey: Corporate Supply Chain Attitudes to Renewable Energy
Corporate Renewable Energy Initiative (CoREi) · Industry association · Source 2025.09
Corporate Renewable Energy Initiative (CoREi)
Industry association
Source
2025.09
- SourceDocument in Korean
K-RE100: Scheme Overview and Compliance Routes
Korea Energy Agency, New & Renewable Energy Center · Public institution · 2026.07
Korea Energy Agency, New & Renewable Energy Center
Public institution
2026.07
- SourceDocument in Korean
Green Premium: How the Bidding and Application Works
Korea Electric Power Corporation (KEPCO) · Public institution · 2026.07
Korea Electric Power Corporation (KEPCO)
Public institution
2026.07
💰 Cutting electricity costs
4 resources · 19 explainersFor lowering your electricity and energy costs
ESCO Programme: Support for Energy Service Companies
This is a route to replacing equipment with high-efficiency alternatives without upfront investment, worth considering for suppliers short on cash who need to fund efficiency upgrades.
2026.07
Electricity Use Across Korea's Semiconductor Belt
A map of electricity use in the electronic components manufacturing industry (C26), based on public statistics.
2026.06 · PDF · 123KB
Energy Supporter: Energy Audits and Technical Guidance for SMEs
A free on-site diagnosis and energy-saving guidance program for small and mid-sized companies using under 2,000 TOE a year — support that suppliers without a dedicated team or budget can use right away.
2026.07
South Korea Energy Market Guide 2026
A practical guide to South Korea's industrial electricity tariffs, K-RE100, renewable electricity procurement, corporate PPA, carbon costs and energy decisions for global manufacturers.
2026.10
K-RE100: Five Compliance Routes Compared
Compares all five options — green premium, REC, third-party PPA, direct PPA, and self-generation — on one page, by cost, scope of recognition, and who each fits best.
2026.06 · PDF · 164KB
Do "Power Saver" Devices Actually Cut a Korean Factory Bill?
The amount an electricity-saving device can cut through power factor improvement is, by regulation, at most 1.0% of the basic charge. Peak reduction has no effect for low-voltage customers. This piece covers the conditions under which the device actually works and how to verify results before and after installation.
2026.09
How to Download Your Plant's Electricity Data from KEPCO
You can download 15-minute interval usage curves from KEPCO's PowerPlanner. Older data isn't kept indefinitely, so if you don't download it now, it can't be recovered later. This piece covers the gap between metered values and billed usage, and which month to check first.
2026.09
- SourceDocument in Korean
ESCO Programme: Support for Energy Service Companies
Korea Energy Agency · Public institution · 2026.07
Korea Energy Agency
Public institution
2026.07
- Insight
South Korea Energy Market Guide 2026
Electricity costs · 2026.10
Electricity costs
2026.10
- SourceDocument in Korean
Energy Supporter: Energy Audits and Technical Guidance for SMEs
Korea Energy Agency · Public institution · 2026.07
Korea Energy Agency
Public institution
2026.07
- Insight
Do "Power Saver" Devices Actually Cut a Korean Factory Bill?
Electricity costs · 2026.09
Electricity costs
2026.09
- DownloadDocument in Korean
Electricity Use Across Korea's Semiconductor Belt
Our own resource · 2026.06
Our own resource
2026.06
- Insight
How to Download Your Plant's Electricity Data from KEPCO
Electricity costs · 2026.09
Electricity costs
2026.09
- DownloadDocument in Korean
K-RE100: Five Compliance Routes Compared
Our own resource · 2026.06
Our own resource
2026.06
- Insight
Why Cutting Contract Power Often Fails to Cut the Bill
Electricity costs · 2026.09
Electricity costs
2026.09
- Insight
Korea Redrew Its Time-of-Use Bands After 49 Years. The Grace Period Is Ending
Electricity costs · 2026.09
Electricity costs
2026.09
- Insight
Off-Peak, Mid-Peak, Peak: Where You Shift Load Decides the Saving
Electricity costs · 2026.09
Electricity costs
2026.09
- Insight
Industrial (A) or Industrial (B): One Line on the Bill Changes the Arithmetic
Electricity costs · 2026.08
Electricity costs
2026.08
- Insight
KEPCO Optional Tariffs I, II and III: Load Factor Decides Which Wins
Electricity costs · 2026.08
Electricity costs
2026.08
- Insight
Same 200,000 kWh, Different Bill: What Load Factor Does
Electricity costs · 2026.08
Electricity costs
2026.08
- Insight
If You Still Think KEPCO's Power Factor Threshold Is 90%, It Changed
Electricity costs · 2026.08
Electricity costs
2026.08
- Insight
Your Basic Charge Is Billed on Billing Demand, Not Contract Power
Electricity costs · 2026.08
Electricity costs
2026.08
- Insight
Contract Power vs Maximum Demand: Which One Can You Actually Manage?
Electricity costs · 2026.08
Electricity costs
2026.08
- Insight
One Peak Reading Can Hold Your Basic Charge for a Year
Electricity costs · 2026.08
Electricity costs
2026.08
- Insight
Contract Power: Why Your Plant Was Given That Number
Electricity costs · 2026.08
Electricity costs
2026.08
- Insight
Using a Factory ESS to Shave the Evening Peak: The Payback Maths
Electricity costs · 2026.06
Electricity costs
2026.06
- Insight
How to Read a Korean Industrial Electricity Bill and Find the Leaks
Electricity costs · 2026.06
Electricity costs
2026.06
- Insight
Where the Savings Sit by Sector: Semiconductor and Auto-Parts Suppliers
Electricity costs · 2026.06
Electricity costs
2026.06
- Insight
Korea's Industrial Electricity Tariff End to End: Basic Charge, Energy, Power Factor, Peak
Electricity costs · 2026.06
Electricity costs
2026.06
- Insight
Five Ways to Cut a Korean Industrial Electricity Bill Without Buying Equipment
Electricity costs · 2026.06
Electricity costs
2026.06
Korean government support programs
These Korean government portals list open energy and carbon support programs on a rolling basis. Deadlines and eligibility are set by each portal — check there for the current status. The portals themselves are in Korean.
Upcoming regulatory dates
D-day is calculated automatically from today · Red has a direct cost or certification impact.
※ Regulatory dates can change — verify with the responsible authority’s official notice before relying on them.
Not sure where your company stands?
Enter your electricity usage and tariff and we'll show what buyers are likely to expect, and what to do first.
Couldn't find what you need?
Tell us what your buyer is asking for and what your company makes, and we'll point you to the right resource.
Stop hunting for REC, PPA and tariff prices
We send REC, SMP, carbon allowance and green premium prices, plus the Korean energy policy changes companies need to track.





























