This piece covers what a supplier should do first after receiving an RE100 data request from a client. It's a 5-step roadmap you can start right away: from step 1, assessing your current status with 12 months of electricity bills and fuel usage records, through checking client requirements, diagnosing CBAM exposure, comparing implementation options, and a detailed bill analysis.
RE100 in Korea · May 21, 2026 · 4 min read
Contents (4)
There is one question we have had more than any other from heads of small and mid-sized manufacturers over the past month.
"Our customer is asking for RE100 data. What on earth do we do first?"
Most supplier staff see RE100 as an enormously complicated, huge project, but in fact the start is unexpectedly simple.
Twelve months of electricity bills and a single spreadsheet are enough to start
With that, you can finish the first 70% of answering RE100 within a week. Today's piece draws on 12 years of designing RE100 portfolios at KEPCO and sets out five steps a semiconductor supplier can start acting on tomorrow.
Why start now?
If you do not start answering RE100 now, you could be pushed out by your customers somewhere between 2027 and 2028. That is not an exaggeration. From a supplier's point of view, the following three pressures are arriving at the same time.
Impact · The three pressures arriving on suppliers at the same time
Pressure from global OEMs
RiskClients asking directly for RE100 and carbon data
- Apple — 100% RE100 mandated for tier 1 and tier 2 suppliers by 2030
- BMW and Tesla — product-level carbon emissions data required from 2026
- Without Scope 1 and 2 data, doing business at all becomes difficult
EU CBAM in full effect
RiskCosts passed down to suppliers even without direct exports
- From 2026, carbon costs fall on manufacturers exporting to the EU directly and indirectly alike
- A strong possibility that large companies pass the cost on to suppliers
- For example: supplier → Hyundai Motor, POSCO, Samsung → export to the EU, the whole flow affected
KEPCO industrial tariff reform
RiskHigher evening prices make acting on your own urgent
- The time-of-use tariff for Industrial (B) was reformed on 16 April 2026
- Prices raised for the evening, 18:00~21:00
- A point at which reviewing self-generation and PPAs becomes more urgent
So what do you do first? — a five-step roadmap
STEP 1. Establish where you stand — 1 week
The core: work out exactly how much electricity your company uses in a year and how much carbon it emits.
You need two things.
- Download 12 months of electricity bills from KEPCO's Cyber Branch
- Pull together a year of city gas and fuel use records
From this data you work out your company's annual electricity consumption (kWh) and annual carbon emissions (tCO₂eq). If you get stuck on the Scope 2 calculation, see the practical guide to calculating Scope 2 emissions.
STEP 2. Confirm what your customers require — 1~2 weeks
The core: find out what RE100 recognition criteria your key customers hold.
This is the most important step, and surprisingly many companies skip it. RE100 recognition criteria differ from customer to customer, and if you buy up a lot of a route your customer does not recognise, that cost is simply sunk.
Ask your customer's ESG staff directly, or check the customer's ESG report. The SK and Samsung supplier assessment checklist sets out the list of routes both companies recognise.
STEP 3. Assess your CBAM exposure — 1 week
The core: check whether you export to the EU, or supply a large company that does.
A company that does not export to the EU directly can still fall within indirect CBAM range. For example, if your company sits in any of the flows below, answering CBAM is unavoidable.
- Automotive parts → Hyundai Motor → export to the EU
- Processed steel → POSCO → export to the EU
- Aluminium parts → Samsung Electronics → export to the EU
Start with a self-assessment using the CBAM quarterly report template.
STEP 4. Compare the RE100 compliance routes — 2 weeks
The core: decide which mix of the five compliance routes fits your company.
There are five RE100 compliance routes recognised by the Korean government.
- Green premium — pay KEPCO an additional charge and have it recognised
- REC purchase — buy certificates directly
- Third-party PPA / direct PPA — a long-term contract with a generation business
- Equity investment — investing in a renewable generation business
- Self-generation (self-consumption) — installing your own equipment
The cost, the timescale and the degree of international recognition are completely different for each. The standard portfolio for a Korean mid-sized manufacturer usually looks like this.
Portfolio · The standard RE100 portfolio for a Korean mid-sized manufacturer (a mix of 4 routes, at median values)
100%
Standard mix
- Third-party / direct PPA40%
Long-term stability, the highest international recognition
- Self-generation25%
A stable base, with a lower electricity bill alongside
- REC purchase25%
Flexible top-up, timing under your control
- Green premium10%
Low-cost filler, limited international recognition
These proportions vary a great deal with a company's circumstances.
- A cramped factory site → less self-generation, more PPA and REC
- Limited funds → REC and green premium first
- Dealing with top-tier global buyers → self-generation plus a PPA strongly recommended
A one-page comparison of the price, contract term and scope of recognition for each route is set out in the REC, green premium and PPA comparison table.
STEP 5. Read your KEPCO bill closely — alongside the rest
The core: find the clues for your RE100 strategy in the electricity bill you receive every month.
Most plant staff look only at the amount billed and send the KEPCO bill up for approval. But that single sheet contains all the core information for an RE100 strategy.
- Annual electricity consumption → the basis for deciding the RE100 volume you need
- Usage pattern by time of day → judging how well self-generation fits
- Maximum demand → deciding the right capacity for self-generation
- Contract power → the scope for an immediate saving
- Power factor → a further point to save on
How long do the five steps take?
Where a member of staff runs this alongside their normal job, the flow through the steps is as follows.
Roadmap · The five steps where staff run them alongside their normal job
Establish where you stand
1 week
Electricity bills + a spreadsheet
Confirm what customers require
1~2 weeks
Interview the ESG staff
Assess CBAM exposure
1 week
A self-assessment checklist
Compare the compliance routes
2 weeks
50% in-house, 50% advisory
Read the bill closely
alongside the rest
A specialist is recommended
- 1
STEP 1
1 weekEstablish where you stand
Electricity bills + a spreadsheet
- 2
STEP 2
1~2 weeksConfirm what customers require
Interview the ESG staff
- 3
STEP 3
1 weekAssess CBAM exposure
A self-assessment checklist
- 4
STEP 4
2 weeksCompare the compliance routes
50% in-house, 50% advisory
- 5
STEP 5
alongside the restRead the bill closely
A specialist is recommended
In 4~6 weeks in total, 70% of the groundwork for RE100 is done
That is measured on being ready to decide, not on execution — signing REC, PPA or self-generation contracts. Execution can be broken into stages.
Three questions we are often asked
Q. We are a small company. Do we really have to do RE100 too?
The size of the company does not matter. What counts is whether your customer's customer is an RE100 member.
Even a parts maker with 30 employees will be asked for RE100 data if the tier 1 supplier receiving those parts is a Samsung or SK supplier. It is not the size of your company but the flow of the supply chain that decides.
Q. Isn't it going to cost far too much?
Starting costs KRW 0.
- STEP 1 to 3 can be done with free material alone
- STEP 4 and 5 involve external advisory fees of roughly KRW 1~3 million (for a mid-sized company)
- Actual RE100 compliance (REC, PPA, self-generation) is done in stages
You have to think of the "cost of starting" and the "cost of executing" separately. Start light, execute in stages.
Q. Our customers have not asked yet. Is there any need to do this in advance?
Starting when the customer's request arrives is already too late
A company that prepared six months to a year ahead has the upper hand when it negotiates with a customer. Self-generation and PPAs take 6~18 months from decision to execution, so if you only start once you have been asked, you have no choice but to take the expensive options: the green premium and spot REC purchases.
- [Source: Korea Energy Agency, the K-RE100 scheme]
- [Source: Apple Supplier Clean Energy Program]
- [Source: Official EU CBAM information (European Commission)]
- [Source: KEPCO industrial electricity tariff]
Note: Schemes, prices and policies may change. Please check the latest guidance from the official bodies before you commit.
Related · Worth reading next

OpenEnergy Editorial Team
RE100 in Korea
We explain K-RE100 rules and compliance procedures at a supplier’s level.
More on RE100 in Korea →Talk to an expert about your company's K-RE100 transition
Tell us about your situation and someone here will write back with the right transition route.
We use these details only to answer this enquiry.
Related articles
Related resources
All resources →- Source⭐ FeaturedDocument in Korean
RE100 Handbook for Korean Companies
Korea Energy Agency · Korea Chamber of Commerce and Industry (Corporate Renewable Energy Support Center) · Public institution · Source 2024.07
Korea Energy Agency · Korea Chamber of Commerce and Industry (Corporate Renewable Energy Support Center)
Public institution
Source
2024.07
- Source⭐ FeaturedDocument in Korean
Company Registration Manual for the Renewable Energy Use Certificate
Korea Energy Agency · Public institution · 2026.07
Korea Energy Agency
Public institution
2026.07
- SourceDocument in Korean
Guide to Renewable Energy Matching Products in Korea
Corporate Renewable Energy Support Center (commissioned by Korea Energy Agency, operated by KCCI) · Public institution · Source 2025.01
Corporate Renewable Energy Support Center (commissioned by Korea Energy Agency, operated by KCCI)
Public institution
Source
2025.01
- SourceDocument in Korean
Corporate Renewable Energy Procurement Guidelines
Corporate Renewable Energy Initiative (CoREi) · Industry association · Source 2024.01
Corporate Renewable Energy Initiative (CoREi)
Industry association
Source
2024.01
Stop hunting for REC, PPA and tariff prices
We send REC, SMP, carbon allowance and green premium prices, plus the Korean energy policy changes companies need to track.