Industrial electricity rates split into Industrial (A) for contract power under 300kW and Industrial (B) for 300kW or more. (A) and (B) have separately published rate tables, and the April 16, 2026 rate reform applied only to Industrial (B). Since contract power is set by equipment capacity, start by checking the contract type on your bill.

Electricity costs · August 31, 2026 · 7 min read

Contents (7)

The Industrial (A) or Industrial (B) written in the "contract type" box at the top of your bill is not a mere classification label. That one line decides, all at once, your basic charge unit price, your energy charge unit price, whether time-of-use rates apply, and even whether you are covered by the recent tariff reform.

What is the difference between Industrial (A) and (B)?

The scale of contract power differs, and because of that the whole tariff table that applies is different. (A) and (B) are both industrial, but the basic charge unit price and the energy charge unit price are published separately for each.

CategoryContract powerSupply voltageApplicable industries
Industrial (A)4 kW or more and under 300 kWLow voltage, high voltage A, high voltage BMining, manufacturing, and other businesses
Industrial (B)300 kW or moreHigh voltage A, high voltage B, high voltage CMining, manufacturing, and other businesses

Source: Basic Terms of Supply, Article 59(2) (in force 2026.07.01).

One exception is missing from the table. Even where contract power is 300 kW or more but under 500 kW, if you are supplied at low voltage, Industrial (A) low-voltage power applies (Basic Terms of Supply, Article 59(3)). That is because (B) has no low-voltage category at all. Look only at contract power and conclude "we are over 300 kW so we are (B)", and you will be wrong in this bracket. You have to check the supply voltage as well.

There is one more thing to watch. The 300 kW boundary is the threshold for the industrial class, not for every use class. For the educational class, for example, (A) is 4 kW or more and under 1,000 kW, and (B) is 1,000 kW or more (Basic Terms of Supply, Article 58(2)). Memorise "(A) and (B) split at 300 kW" and you will be wrong in other use classes.

How is the contract power that divides (A) from (B) determined?

It is determined by equipment capacity, not by actual consumption. Article 20 of the Basic Terms of Supply provides that contract power is calculated by multiplying the sum of the individual inputs of the consuming equipment by conversion rates.

BracketConversion rate
First 75 kW100%
Next 75 kW85%
Next 75 kW75%
Next 75 kW65%
The portion above 300 kW60%

Source: Basic Terms of Supply, Article 20(1)1 (in force 2026.07.01).

That means the total of all your equipment is not itself your contract power. For a factory whose equipment totals 300 kW, the converted result is 75×1.0 + 75×0.85 + 75×0.75 + 75×0.65 = 243.75 kW, and because the note to that same provision requires fractions below 1 kW to be rounded at the first decimal place, the contract power comes out at 244 kW. It is 300 kW on an equipment basis but stays in (A) on a contract power basis. Where the contract is based on transformer capacity, the sum of the rated capacities of the primary transformers is used, and 1 kVA is treated as 1 kW here. A fuller account of the calculation is in What contract power is.

Why are (A) I and (A) II separated?

It is not contract power but supply voltage that divides them. Article 59(5) of the Basic Terms of Supply provides that Industrial (A) customers on high voltage are subject to Industrial Power (A) II in Appendix 1 (the monthly electricity tariff table). (A) II has no low-voltage column, and low-voltage customers are subject to (A) I low-voltage power, so the result is that (A) I is low voltage and (A) II is high voltage.

The "kW boundary that divides (A) I from (A) II" that people often look for does not exist in the terms of supply. Where a high-voltage customer is metered at low voltage, the charge treatment is set separately in the Implementation Rules (the proviso to the same paragraph).

(A) I and (A) II — what divides them is supply voltage, not kW

Industrial (A) I

Supply voltage
Low voltage
Applicable tariff table
Appendix 1, low-voltage power
Time-of-use meter
Not subject to installation
Saving by shifting load
No lever

Industrial (A) II

Supply voltage
High voltage
Applicable tariff table
Appendix 1, Industrial Power (A) II
Time-of-use meter
Subject to installation (time-of-use rates)
Saving by shifting load
Possible by shifting operating hours

What that split leads to is whether you are metered by time of day. Article 38(2) of the Basic Terms of Supply provides that time-of-use meters are to be installed for General (A) II, Industrial (A) II, General (B), Educational (B), and Industrial (B). In other words, time-of-use (TOU) rates start from (A) II, and (A) I has no time-of-day distinction.

This means the very way you reduce your bill is different. (A) II and (B) can cut the energy charge by moving operations across off-peak, mid-peak, and peak, whereas (A) I has no such lever at all. Moving up from low voltage to high voltage does not just mean a different unit price table; it also means you gain a new means of cutting your bill by shifting the hours you operate.

A row of high-voltage switchgear at a substation under a blue sky. Silver equipment sits on top of red ribbed insulators, with conductors coming down from above and connecting to each unit.
(A) II and (B) take their electricity through high-voltage equipment like this. This supply voltage is exactly where the split from (A) I happens. Photo: Unsplash free licence

Is (B) always cheaper?

No. (A) and (B) simply have different unit price tables; neither is structured to be unconditionally favourable. As contract power grows, the total basic charge grows with it, so a lower unit price is no guarantee of a lower total.

And in the first place, (A) and (B) are not something you choose. The structure is that when contract power crosses the boundary, the class follows it across. What actually determines your position is not whether you are (A) or (B) but the optional tariff you choose within the same class, and how you manage maximum demand.

Did the April 2026 tariff reform apply to (A) as well?

The unit price changes applied to Industrial (B) only. In the tariff table in force 16 April 2026, what changed in price was Industrial (B); the unit prices for Industrial (A) I and II, for General, and for the low-voltage classes have not changed since 1 April 2025. The basic charge unit prices did not change either.

The redrawing of the time bands took effect on different dates for different classes. It was not implemented on a single date across the board.

Contract typeWhen the revised Appendix 3 applies
Industrial (B)16 April 2026
General (A) II, Industrial (A) II, General (B), Educational (B)1 June 2026
Industrial (A) I and other low-voltage, non-time-of-use classesNot covered

Source: Basic Terms of Supply, supplementary provisions (2026.3.16), transitional measures items 2 and 5 (in force 2026.07.01).

It is not that "everything else" was pushed back to 1 June. Appendix 3 (the table of seasonal and time-of-day divisions) applies only to classes metered by time of day, so low-voltage, non-time-of-use classes including Industrial (A) I were never covered by the redrawing in the first place.

As a result, between 16 April and 31 May 2026 the time bands differed from one class to another even within the same month. For what the reform contains, see The time-of-use tariff reform explained.

On top of this there is a grace period that applies to Industrial (B) alone. Item 4 of the transitional measures in the same supplementary provisions defers application of the revised Appendices 1 and 3 until 30 September 2026 for Industrial (B) customers who completed a grace period application during the period KEPCO announced. During the grace period, the former time bands continue to apply, but the energy charge is calculated with the adjustments below.

-5.1KRW/kWh

Off-peak deduction — summer, spring/autumn, and winter alike

+13.2KRW/kWh

Spring and autumn peak addition

+16.9KRW/kWh

Summer and winter peak addition

You have to establish whether your site applied for the grace period before you can read bills for April onwards properly.

Can we choose and change our contract type ourselves?

You do not choose the contract type itself; change your contract power and the class follows. Industrial (A) and (B) are values determined by your industry and your contract power, not items you apply for.

What we can actually move is contract power. If you have rationalised equipment or cut production lines so that contract power has become excessive, you can consider reducing it. The procedure and the constraints are set out in How to change (reduce) contract power. Note, though, that lowering contract power also lowers the floor used in calculating the basic charge, so you should move only after checking at least 12 months of records.

How do we check which one our factory is?

Looking at the "contract type" box on the bill is the quickest and most accurate way. Rather than calculating contract power and inferring it, read the value KEPCO has written on the bill as it stands.

There really are cases where the calculated value and the bill do not agree. Among the sites we manage there was one whose contract power was 350 kW but which was billed under the contract type Industrial (A) II (our own observation, 2026). The kW brackets in the tariff table are the basic criterion dividing the contract types, but the class an individual site is billed under can differ according to its contract history. The basis for a judgement is always the bill.

Four things to check on the bill

  • Contract type — which of Industrial (A) I, (A) II, or (B) it is
  • Contract power (kW) — how far it sits from the 300 kW boundary
  • Supply voltage — low voltage, or high voltage A, B, or C (this is exactly what divides (A) I from (A) II, and at 300–500 kW on low voltage you are (A), not (B))
  • Time-of-use consumption bands shown — if they are there, you are subject to time-of-use rates
If the calculated contract power and the contract type on the bill appear not to agree, do not fill the gap with a guess; check with your KEPCO branch.
  • [Source: KEPCO's Basic Terms of Supply, Article 59 (industrial power), paragraphs 2, 3, and 5, in force 2026.07.01]
  • [Source: KEPCO's Basic Terms of Supply, Article 58 (educational power), paragraph 2, in force 2026.07.01]
  • [Source: KEPCO's Basic Terms of Supply, Article 20 (calculation of contract power), paragraph 1, item 1, in force 2026.07.01]
  • [Source: KEPCO's Basic Terms of Supply, supplementary provisions (2026.3.16), transitional measures items 2, 4, and 5, in force 2026.07.01]
  • [Source: KEPCO — electricity tariff table (Industrial (A) and (B)), retrieved 2026-09]

Note: The contract power brackets, conversion rates, and effective dates in the text are values checked against the source text of the provisions above. Tariff tables and terms of supply may be revised, so please confirm what actually applies from your own site's bill and KEPCO's terms of supply currently in force.

OpenEnergy Editorial Team

Electricity costs

We unpack KEPCO tariff structure and cost-cutting methods in practical terms.

More on Electricity costs →

Talk to an expert about your company's K-RE100 transition

Tell us about your situation and someone here will write back with the right transition route.

We use these details only to answer this enquiry.